1. Home
  2. Projects

Past performance

Schools. Transit. Bridges. Cities. The Port.

16 public works contracts for 12 public owners across Southern California, $1.9M+ in total, each built with the prevailing-wage compliance public work requires.

  1. Lit electronic marquee sign at Chula Vista Adult School01 · Chula Vista$275K

    Sweetwater Union HSD

    Adult Schools Marquees

    Electronic marquee program: CPM and finishes

    Sub to Harbor Coating & Restoration

  2. Refinished locker room at the North County Transit District facility in Oceanside02 · Oceanside$254K

    North County Transit District

    BOE Various Finishes Upgrades

    Transit facility finishes upgrades

    Completed July 2026

  3. JNH crew on site for the San Clemente pedestrian bridge recoating03 · San Clemente$210K

    City of San Clemente

    Montalvo & Riviera Bridge Recoating

    Carboline coating system on steel pedestrian bridges

    Completed January 2025 · sub to HCR

  4. Finished band and music room with new carpet at Mar Vista Academy04 · Chula Vista$179K

    Sweetwater Union HSD

    MVA Building 800 Remodel

    Three classrooms remodeled into a middle school band and music room

    Completed October 2024

  5. 05 · Julian$160K

    CA State Parks · Cuyamaca Rancho

    Residence 13 Siding Replacement

    Demo, siding, windows, frames, doors, decking, fireproofing and painting

    Completed January 2024

  6. 06 · Chula Vista$129K

    Sweetwater Union HSD

    3 Adult Schools Light Fixture Replacement

    Removal and haul-off of 150 exterior light fixtures

    Completed January 2025 · sub to HCR

  7. 07 · Cypress$128K

    North Orange County CCD

    Cypress College Exterior Painting

    Stucco and concrete repair and exterior painting of the Library and Student Center

    Completed September 2024

  8. Reconfigured office with bay views at the Port of San Diego administration building08 · San Diego$127K

    Port of San Diego

    Admin Building Dispatch Center Reconfiguration

    5th-floor dispatch center space reconfiguration

    Public works contract

  9. New office doors and interior window in the Hillsdale counseling center09 · El Cajon$126K

    Cajon Valley Union SD

    Hillsdale Counseling Center

    One large room rebuilt as a counseling department with 5 offices and a conference room: steel framing, windows, doors, drywall, insulation, low voltage, data, paint and HVAC

    Completed July 2025

  10. Resurfaced and stained wood light pole on a Del Mar street10 · Del Mar$98K

    City of Del Mar

    Light Pole Wood Resurfacing

    Sanding, staining and protecting 61 Accoya wood light posts

    Completed September 2025

  11. 11 · Riverside$83K

    State of California · EDD

    Riverside EDD Painting

    Interior and exterior painting

    Completed June 2026

  12. 12 · West Covina$56K

    State of California · DMV

    West Covina DMV Refresh

    Interior and exterior painting, ceiling tiles, cove base and door staining

    Completed June 2026

  13. New concrete walkway at a Cajon Valley elementary school13 · El Cajon$54K

    Cajon Valley Union SD

    Concrete Projects, Various Sites

    Concrete demolition and repair at several elementary school sites

    Completed August 2025

  14. Freshly painted steel canopies at a Solana Beach school campus14 · Solana Beach$33K

    Solana Beach School District

    School District Paint Project

    Exterior painting of steel canopies, fascia and building trim at school campuses

    Public works contract

  15. Custom stainless steel cabinets installed in the San Marcos community center kitchen15 · San Marcos$33K

    City of San Marcos

    Community Center Kitchen Cabinets

    Worn laminate shelving in the community center kitchen replaced with custom stainless steel cabinets: fabrication, delivery and installation

    Completed June 2026

  16. Refinished wood light pole with a UC San Diego banner on campus16 · La Jolla

    UC San Diego

    Campus Light Pole Refinishing

    Stripping, sanding and refinishing weathered wood light poles across campus walkways

    Completed 2026

  17. Finished jewelry showroom with lit glass display cases installed by JNH17 · San Diego

    Commercial client · Retail

    Jewelry Showroom Display Cases

    Delivery and installation of lit glass display cases and counters for a retail jewelry showroom

    Completed 2026

  18. Finished arched book nook with bench seat and side niches in a North County home18 · North County San Diego

    Residential client · Homeowner

    Arched Book Nook Remodel

    Dated built-in wood cabinets removed and the wall rebuilt as an arched reading nook with a bench seat and side niches

    Completed 2025

Before & after

Same rooms. New purpose.

MVA Building 800 — Sweetwater Union HSD

Three classrooms remodeled into a middle school band and music room.

MVA Building 800 — Sweetwater Union HSD, before
Before
MVA Building 800 — Sweetwater Union HSD, after
After

Hillsdale Counseling Center — Cajon Valley Union SD

One large room rebuilt as a counseling department with 5 offices and a conference room.

Hillsdale Counseling Center — Cajon Valley Union SD, before
Before
Hillsdale Counseling Center — Cajon Valley Union SD, after
After

Locker Rooms — North County Transit District

Lockers masked, prepped and refinished as part of the BOE finishes upgrades in Oceanside.

Locker Rooms — North County Transit District, before
Before
Locker Rooms — North County Transit District, after
After

School Exteriors — Solana Beach School District

Peeling fascia and trim stripped, prepped and repainted.

School Exteriors — Solana Beach School District, before
Before
School Exteriors — Solana Beach School District, after
After

Campus Light Poles — UC San Diego

Weathered wood poles stripped, sanded and refinished to a uniform, protected finish.

Campus Light Poles — UC San Diego, before
Before
Campus Light Poles — UC San Diego, after
After

Community Center Kitchen — City of San Marcos

Worn laminate shelving replaced with custom stainless steel cabinets, fabricated and installed.

Community Center Kitchen — City of San Marcos, before
Before
Community Center Kitchen — City of San Marcos, after
After

Book Nook — North County Home

Dated built-in wood cabinets removed and the wall rebuilt as an arched reading nook with a bench and side niches.

Book Nook — North County Home, before
Before
Book Nook — North County Home, after
After

Free quote

Put JNH on your next one.

Every request goes straight to Nichole Putrus, the licensed owner who runs the field. You get a clear scope and one number.

Call nowFree quote