MVA Building 800 — Sweetwater Union HSD
Three classrooms remodeled into a middle school band and music room.


Past performance
16 public works contracts for 12 public owners across Southern California, $1.9M+ in total, each built with the prevailing-wage compliance public work requires.
01 · Chula Vista$275KSweetwater Union HSD
Electronic marquee program: CPM and finishes
Sub to Harbor Coating & Restoration
02 · Oceanside$254KNorth County Transit District
Transit facility finishes upgrades
Completed July 2026
03 · San Clemente$210KCity of San Clemente
Carboline coating system on steel pedestrian bridges
Completed January 2025 · sub to HCR
04 · Chula Vista$179KSweetwater Union HSD
Three classrooms remodeled into a middle school band and music room
Completed October 2024
CA State Parks · Cuyamaca Rancho
Demo, siding, windows, frames, doors, decking, fireproofing and painting
Completed January 2024
Sweetwater Union HSD
Removal and haul-off of 150 exterior light fixtures
Completed January 2025 · sub to HCR
North Orange County CCD
Stucco and concrete repair and exterior painting of the Library and Student Center
Completed September 2024
08 · San Diego$127KPort of San Diego
5th-floor dispatch center space reconfiguration
Public works contract
09 · El Cajon$126KCajon Valley Union SD
One large room rebuilt as a counseling department with 5 offices and a conference room: steel framing, windows, doors, drywall, insulation, low voltage, data, paint and HVAC
Completed July 2025
10 · Del Mar$98KCity of Del Mar
Sanding, staining and protecting 61 Accoya wood light posts
Completed September 2025
State of California · EDD
Interior and exterior painting
Completed June 2026
State of California · DMV
Interior and exterior painting, ceiling tiles, cove base and door staining
Completed June 2026
13 · El Cajon$54KCajon Valley Union SD
Concrete demolition and repair at several elementary school sites
Completed August 2025
14 · Solana Beach$33KSolana Beach School District
Exterior painting of steel canopies, fascia and building trim at school campuses
Public works contract
15 · San Marcos$33KCity of San Marcos
Worn laminate shelving in the community center kitchen replaced with custom stainless steel cabinets: fabrication, delivery and installation
Completed June 2026
16 · La JollaUC San Diego
Stripping, sanding and refinishing weathered wood light poles across campus walkways
Completed 2026
17 · San DiegoCommercial client · Retail
Delivery and installation of lit glass display cases and counters for a retail jewelry showroom
Completed 2026
18 · North County San DiegoResidential client · Homeowner
Dated built-in wood cabinets removed and the wall rebuilt as an arched reading nook with a bench seat and side niches
Completed 2025
Before & after
Three classrooms remodeled into a middle school band and music room.


One large room rebuilt as a counseling department with 5 offices and a conference room.


Lockers masked, prepped and refinished as part of the BOE finishes upgrades in Oceanside.


Peeling fascia and trim stripped, prepped and repainted.


Weathered wood poles stripped, sanded and refinished to a uniform, protected finish.


Worn laminate shelving replaced with custom stainless steel cabinets, fabricated and installed.


Dated built-in wood cabinets removed and the wall rebuilt as an arched reading nook with a bench and side niches.


Free quote